Under construction, please look forward to it
The gas well head pressure decreases slowly from high pressure to about 0.3~2 MPa after long-term mining. The natural gas (containing a small amount of water) from the gas well needs to be pressurized to more than 2 MPa and then treated centrally through the long-distance pipeline to the treatment station. High pressure should be injected when the well pressure is too low Days Natural gas increases formation pressure to increase wellhead production.
YB type gas-liquid mixing and pressurization device can reduce the flow pressure of gas well (gas well) by using compressor to increase the recovery rate of gas reservoir and achieve the purpose of tapping potential and increasing efficiency and protecting production and supply.
Technical specifications | Type of equipment | ||||||
YB 0.42-74A | YB 1.0-60 | YB 1.2-45 | YB 1.2-66 | YB 2.0-45 | YB 1.25-90 | YB 2.5-270 | |
Structure form | skid mounted, first class compression, compression ratio <5 | ||||||
Air intake pressure (MPa) | 3-13 | 0.3-6 | 0.3-6 | 0.3-6 | 0-4.3 | 0.3-2 | 0.3-4 |
Exhaust pressure (MPa) | 15 | 1-9 | 1-6 | 1-6 | 1-4 | 1-4 | 1-4 |
Exhaust (Nm3/d) | 10000-60000 | 5000-60000 | 5000-40000 | 5000-40000 | 5000-40000 | 10000-30000 | 40000-60000 |
Liquid content in medium | 90% | 90% | 90% | 90% | 90% | 90% | 90% |
Motor power (kW) | 37+37 | 30+30 | 45(electric drive) | 66(fuel drive) | 45 | 45+45 | 90+90+90 |
Total power (KW) | 82 | 72 | 52 | 66 | 52 | 97 | 300 |
Fuel tank (L) | 1500 | 1000 | 400 | 400 | 400 | 1500 | 1500 |
Dimensions (m/L*W*H) | 4.5×2.5×2.75 | 5×2.4×2.75 | 2.8×2.4×2.75 | 6×2.4×2.75 | 4.8×2.4×2.75 | 8×2.4×3 | 9.5×2.9×2.75 |
Customizable products according to customer's on-site requirements |
The company now has more than 30 scientific research and technical personnel, 5 senior engineers. There are 10 staff with intermediate titles and 3 part-time professors and consultants. It is now the Qidakon Technology Center of Huazhong University of Science and Technology, the Qidakon Industry-science base of Huazhong University of Science and Technology, and the Qidakon Collaborative innovation research and Development base of Hubei University of Technology, and was assessed as the district-level technology research and development center of Wuhan Hanyang District by Wuhan Science and Technology Bureau in 2011. In 2012, it was recognized as a national high-tech enterprise. The "New natural gas hydraulic compressor" project independently developed by the company won the National Technology Innovation Fund in 2010, and in the same year, led the preparation and drafting of JB/T11422-2013 "Hydraulic natural gas compressor for automobile filling station" industry standard. In 2015, it was awarded the "Natural gas Booster equipment overall Solution Technology Center" by China Petroleum and Petrochemical Engineering Research Society.
Pre- Sale Services
Provide installation and commissioning training for customer operators according to customer requirements. At the same time,
organize and register product information and set up customer files.
Services on sale
The professional technical service engineer guides the installation and commissioning on the side or on the line. And warning of the possible failure of the equipment.
After-Sales Service
Timely and rapid response ,24-hour on-line service, provide lifelong maintenance.
CNG REFUELING STATION